Skip to content
LekhaPro
Hyderabad · Telangana · GST code 36

Manufacturing ERP software in Hyderabad

Yes — LekhaPro's Manufacturing pack runs a Hyderabad plant: work centres and multi-level BOMs feeding a deterministic MRP, finite-capacity scheduling, production orders with actual-vs-standard cost variance, QMS with batch traceability and recall, and OEE per shift. Industrial land around Hyderabad is allotted by TGIIC — Telangana Industrial Infrastructure Corporation (tgiic.telangana.gov.in), which is where most units here got their plot. Cloud edition, any browser.

What Telangana sets for a Hyderabad manufacturer

Telangana compliance facts relevant to manufacturing in Hyderabad
ItemTelanganaSource
GST state code36 — first two digits of every GSTIN hereStatutory
Industrial development bodyTGIIC — Telangana Industrial Infrastructure Corporation (tgiic.telangana.gov.in)TGIIC official site (Telangana govt) · checked 2026-08-05
Intra-state e-way billSet by state notificationset by state notification — verify before relying on it
Professional taxLevied — Telangana Tax on Professions, Trades, Callings and Employments Act, 1987Telangana PT Act 1987 · tgct.gov.in · checked 2026-08-05

The full Telangana compliance table — every state-level fact we track, with sources — is on the Telangana state page.

The Hyderabad trade, honestly

Hyderabad manufactures under two demanding regimes. Bulk drugs and formulations run out of Jeedimetla, Bollaram and Pashamylaram, with biotech at Genome Valley — a world of GMP, batch manufacturing records, COAs and recall traceability down to raw-material lots. Aerospace and precision engineering cluster at Adibatla and around Balanagar’s older machine-building base, where stage inspection and material genealogy rule instead. The state industrial infrastructure corporation allots and administers these estates. A plant in either camp needs production software that treats quality records as first-class data — deviations, NCRs and CAPA linked to the exact batch or serial.

What a Hyderabad manufacturer gets

  • Work centres, machines, routings & multi-level BOMs
  • Deterministic MRP explosion — scrap-aware netting, make/buy
  • Production orders → work orders → material issues → close
  • Production planning and demand planning ahead of the MRP run
  • Actual-vs-standard cost variance on every order
  • Finite-capacity scheduling board, shifts & conflict detection
  • Supplier-quality scoring on incoming inspections
  • Inspections, NCRs, CAPAs, QMS instruments & COA certificates
  • Batch & serial traceability with cascading recall
  • OEE per shift, downtime Pareto & machine analytics
  • CMMS maintenance, tool & die, waste/scrap and energy registers
  • Eleven-element cost sheet with per-unit cost, margin and variance
  • Job work & subcontract, engineering change, controlled engineering docs
  • An executive dashboard over the plant, and an Industry-4.0 shop-floor read

Plans are ₹249, ₹449 and ₹2,499 a month — GST-inclusive totals on pricing. New to the terms? Place of supply decides the tax head on every invoice, and goods movements may need an e-way bill.

What it does not do — in Hyderabad or anywhere

  • · The Manufacturing pack is Cloud-only — it runs in a browser. The offline desktop edition has its own smaller BOM-production-costing workflow for a single Hyderabad unit; the two do not sync.
  • · No machine or IoT drivers are wired — the device registry, telemetry landing zone and OPC-UA/SCADA connector records ship as an ingest seam; readings arrive through the app today.
  • · No native shop-floor mobile app — there is a touch-first shop-floor web surface with scan-to-resolve and an offline action queue in the browser.
  • · It does not file GST returns or ITC-04 for you — documents post to the books; submission stays with you or your CA.
  • · No office in Hyderabad — sales and support are online (email and WhatsApp) from an India-based team, with no local branch, reseller or on-site visit.
  • · No payroll, attendance or HR module — staff salaries and professional tax stay with your CA, in Telangana as everywhere.

Questions Hyderabad manufacturers ask

Does the Manufacturing pack work for a Hyderabad plant?

Yes. Work centres, machines, routings and multi-level BOMs model the plant; a deterministic MRP run explodes demand into make-or-buy planned orders; and the finite-capacity board places every operation on a work centre with late work flagged. It is a Cloud pack — the offline desktop edition has its own smaller production workflow for a single unit.

Who allots industrial land around Hyderabad?

TGIIC — Telangana Industrial Infrastructure Corporation (tgiic.telangana.gov.in) (TGIIC official site (Telangana govt), checked 2026-08-05) — the body behind most industrial estates in Telangana. That is context for expansion planning; LekhaPro does not apply for plots or incentives, and we would rather say so than imply a liaison service.

Can I trust the MRP and costing numbers?

Yes — the MRP explosion, cost roll-ups, OEE and the scheduler are pure engines with no clock reads or randomness, unit-tested against hand-worked examples, so the same data reproduces the same answer every run. The server recomputes every BOM cost roll-up; a client total is never trusted.

What does a production order actually track?

The standard cost it was released at, then reality: operators book labour and machine minutes with completed and rejected quantities, material issues prefill from the BOM, and closing rolls actual material and operation cost into a per-unit actual with the variance against standard — in integer paise. The eleven-element cost sheet shows where the margin went.

How deep does quality and traceability go?

Incoming, in-process and final inspections; NCRs with severity and disposition; CAPAs with root cause; instruments, sampling plans and COA certificates. Batches and serials carry a genealogy trace, and a recall cascades to every downstream batch — with engineering change requests governing the revision that caused it. For a Hyderabad vendor facing a customer audit, that trail is the audit.

Does it measure OEE honestly?

OEE is computed as Availability × Performance × Quality per shift record and banded — world-class, acceptable, needs attention — with a per-machine trend and a downtime Pareto. The Factory Health Scorecard folds six weighted pillars into one 0–100 score, and a pillar it cannot measure is excluded with weights renormalised rather than assumed perfect.

How is job work handled — and its paperwork?

Job work and subcontract operations are modelled in the pack, and the e-way bill JSON for material moving to a job worker generates from the underlying document — Telangana's intra-state threshold is set by notification, so check the current one. The ITC-04 return itself stays with you or your CA.

What about machine maintenance?

A CMMS register carries the maintenance schedule and history alongside tool-and-die, waste/scrap and energy registers — so downtime has a paper trail and the machine that eats the schedule shows up in its own numbers rather than in operator folklore.

Does it connect to our machines?

Not yet with live drivers, and we say that plainly: a device, sensor and gateway registry, a telemetry landing zone and OPC-UA/SCADA/MES connector records ship as the ingest seam, with predictive maintenance scoring whatever readings arrive. Today readings come through the app, not from the PLC.

How do we try it on our Hyderabad shop floor?

14 days free, no card. Model one product's real BOM and routing, run the MRP against a live order book, and release one production order through to close — the actual-versus-standard variance on that first order tells you more than any demo. We sell and support online only, with no Hyderabad branch. Local context: Hyderabad manufactures under two demanding regimes.